Wednesday, January 8, 2020

Material Take Off And Building Cost Estimation











About:

This is a gig for Cost Estimation & Quantities Takeoff of the Residential and Commercial Construction projects in USA,  UK, Australia, and Dubai. I have worked on following CSI divisions :


Division 02 — Existing Conditions 
Division 03 — Concrete (e.g., footings, slabs, precast, grouting)
Division 04 — Masonry (e.g., concrete block, brick, stone)
Division 05 — Metals (e.g., structural steel framing, joists, decorative metals, etc.)
Division 06 — Wood, Plastics, and Composites
Division 07 — Thermal and Moisture Protection (e.g., insulation, water barriers, sealant)
Division 08 — Openings 
Division 09 — Finishes
Division 10 — Specialties
Division 11 — Equipment
Division 12 — Furnishings
Division 21 — Fire Suppression
Division 22 — Plumbing
Division 23 — Heating, Ventilating, and Air Conditioning (HVAC)
Division 26 — Electrical
Division 27 — Communications (e.g., data, voice, audio/visual systems)
Division 31 — Earthwork


Please contact before placing order. Thanks

Reviews


:

As always he do a great work

:

Communication is great, service is great!

:

Awesome knowledgeable seller . Very fast

:

Very helpful, as always. We will continue to use this provider.

:

Great work, always on time and great communication.




No comments:

Post a Comment